Savio College Gymnasium

Savio College Gymnasium

Back to Steel Work Savio College Gymnasium The structural design of the steel dome structure was commissioned for by the steel fabricator. The analysis consists of a 3-hinged arched dome construction of 35m span, with a central tension ring taking a light lantern. The...
Aviation Part 2

Aviation Part 2

Back to Steel Work Aviation Part 2 Phase 2 A second hanger Phase 2 was then constructed in 2009.  This consists of a  steel portal Bellman type hangar 30m * 54m * 8m high which together with the external landscaping works completes the...